Galaxy provides commercial HVAC installation for new buildings in Contra Costa and Alameda counties, plus San Francisco. Equipment sizing, ductwork, controls, and air distribution should be planned together for the intended occupancy. Share the building use, available drawings, and construction milestones to discuss the installation scope and coordination responsibilities.

Share the location, planned occupancy, drawing status, and anticipated construction sequence. Scope and availability need project-specific confirmation.

Galaxy commercial HVAC crew in hard hats and safety vests standing in front of a Galaxy service truck
Licensed / bonded / insuredCSLB #1076868 · B, C-10, C-20Contra Costa / Alameda / San Francisco
New Construction scope

Decisions to resolve before installation

01

Loads & intended occupancy

Floor area alone cannot describe a new commercial building’s heating, cooling, or ventilation needs. Establish the assumptions that will guide equipment selection.

  • Envelope, glazing, orientation, and local conditions
  • Expected headcount, operating hours, and internal heat sources
  • Ventilation and exhaust needs for the proposed use
  • Tenant fit-out assumptions and future changes to occupancy
02

Equipment, ducts & controls

Equipment locations, air paths, and control zones need to work as one system, not as separate purchases.

  • Compare rooftop, split, heat pump, and zoned configurations for the project
  • Reserve space for duct routes, returns, and service access
  • Align zones with different schedules and room uses
  • Define thermostats, sensors, sequences, and any automation interface
03

Roof & electrical interfaces

The mechanical layout must be compatible with the structure, roof assembly, and available power. Resolve these interfaces before equipment is ordered.

  • Equipment weight, supports, curbs, and roof penetrations
  • Roofing details, drainage, and maintainable access
  • Voltage, phase, electrical capacity, and disconnect locations
  • Condensate routes, piping paths, and installation clearances
04

Scope & trade coordination

A useful construction scope makes ownership clear at every interface. Confirm which tasks are included and which require another trade or design professional.

  • Design documents, permits, and inspection responsibilities
  • Structural, roofing, electrical, and controls coordination
  • Installation sequence and access for equipment placement
  • Startup, balancing, commissioning, and handover deliverables
Commercial HVAC planning

Planning HVAC for a new commercial building

A new commercial HVAC system needs to fit the building as it will actually be occupied, not just the lines on an early floor plan. Decisions about room use, outdoor air, equipment location, electrical service, duct routes, controls, and construction sequencing are connected. Clarifying those decisions early can help owners, builders, and their project teams identify conflicts before equipment and building systems are committed.

Galaxy Heating & Air Conditioning provides commercial HVAC installation for new construction in Contra Costa and Alameda counties, plus San Francisco. The appropriate project scope, design responsibilities, permits, schedule, and deliverables should be confirmed for the specific building and agreement.

Start with the intended use and realistic load assumptions

The same floor area can have very different heating and cooling needs depending on who uses it and what happens inside. An office with occasional meeting-room peaks, a retail space with frequent door openings, a restaurant with cooking equipment and exhaust, and a warehouse with high ceilings each create distinct conditions. A project team should document expected occupancy, operating hours, room functions, lighting and equipment loads, exterior exposure, and any process activity that affects heat or moisture.

Those assumptions should be revisited when the layout or tenant plan changes. A conference room sized for a small team can be uncomfortable when routinely used for larger gatherings; a planned storage area may later become occupied workspace. Outdoor air and exhaust requirements also need to be considered alongside heating and cooling, rather than added as an afterthought. Where a tenant or business has specialized environmental requirements, identify them early and confirm which qualified project professional is responsible for defining them.

Equipment capacity should follow an appropriate assessment of the building and its intended use, not a rule of thumb based only on square footage or a neighboring property. The owner and builder should ask what information the sizing relies on, which spaces and operating conditions it includes, and how design changes will be handled. The calculation method and responsible professional should be established for the project rather than assumed from a general HVAC discussion.

Coordinate system choice, ducts, zones, and controls together

System type affects where equipment can be installed and how conditioned air reaches occupants. Rooftop units, commercial split systems, heat pumps, and variable refrigerant flow arrangements each have different equipment locations, connections, service needs, and control implications. Selection should account for the building’s plan, available utility infrastructure, operating pattern, maintainability, and the owner’s priorities. A system label by itself does not establish that a particular option is suitable for the site.

Duct routes should be reserved while structural members, ceilings, lights, fire protection, plumbing, and other services are being coordinated. Plan for duct dimensions, transitions, insulation where specified, access to dampers and service points, and the location of supply and return openings. A route that fits on a drawing may be obstructed by a beam or crowded above the finished ceiling. Resolving such conflicts before installation is easier than asking field crews to improvise after other trades have completed their work.

Controls deserve the same attention as equipment. Identify which rooms or areas need independent control, where sensors and thermostats will be located, who can access them, and whether connection to a building automation system is intended. Zoning decisions influence duct design and operating behavior; sensors in an unrepresentative location can cause the system to respond poorly to occupied rooms. Confirm the intended control sequence and interfaces among the owner, design team, controls provider, and HVAC installer before procurement.

Check roof, structure, access, and electrical interfaces early

For rooftop equipment, confirm the proposed location against structural support, roof construction, drainage, clearances, weatherproofing, and the building’s service-access plan. Equipment weight, curb or support details, penetrations, and the route for lifting equipment onto the roof require coordination with the appropriate project professionals. The HVAC scope should make clear which roof work is included and which work belongs to the roofing, structural, or other construction trades.

Electrical compatibility also needs to be established from the selected equipment requirements and the building’s electrical design. Confirm who determines circuit and disconnect requirements, provides conductors and overcurrent protection, makes final connections, and verifies the available service. Similar responsibility questions apply to condensate disposal, refrigerant piping, sleeves, fire or smoke interfaces, and building controls. A plan or proposal should identify interfaces and assumptions rather than treating every connection as automatically included.

Access is a lifecycle issue as well as a construction issue. Allow safe working space around equipment and a practical path for future inspection or replacement. Coordinate this with roof walkways, screens, ladders, fall-protection provisions, and other rooftop equipment as applicable. Any structural, electrical, roofing, or code determination should be made by the professional responsible for that scope; unresolved conditions should be documented and addressed before work proceeds.

Make design, permit, and trade responsibilities explicit

Commercial construction commonly involves an owner, architect, engineers, general contractor, subcontractors, utilities, inspectors, and future building operator. Their roles vary by project. Before work is authorized, establish who is preparing the HVAC design and construction documents, who is responsible for calculations and equipment schedules, and who reviews coordination changes. Confirm whether any design work requires a specifically qualified or licensed professional and who will provide it. Do not infer engineering or design credentials from an HVAC installation capability.

Permit and inspection requirements depend on jurisdiction, building conditions, and project scope. The project team should confirm which applications, plan reviews, inspections, and approvals apply, and assign responsibility for preparing, submitting, coordinating, and closing them. Also clarify who manages Title 24 or other energy-code documentation where applicable, and who coordinates electrical, structural, fire-life-safety, and roofing approvals. Requirements should be verified for the actual project rather than presumed from a generic checklist.

The written agreement should distinguish the HVAC installer’s work from work assigned to other trades or consultants. It should address who supplies equipment, supports, curbs, controls, electrical connections, duct openings, roof penetrations, and patching; who provides site access and lifting; and how design revisions or concealed conditions are handled. Put open questions and exclusions in writing, with a named party responsible for resolving each one before it becomes a field conflict.

Use a defined scope to coordinate construction sequencing

A useful HVAC scope identifies the equipment and areas served, the included duct and piping work, the control components and interfaces, electrical and drainage boundaries, and any startup or commissioning activities. It should state what is excluded, what assumptions affect the scope, and how substitutions or changes will be approved. Owners should compare proposals by responsibilities and deliverables, not only by equipment descriptions. If a line item or interface is unclear, ask who owns it and what evidence will show that it is complete.

Sequencing should be coordinated with the project schedule and the work of other trades. Equipment delivery, rooftop placement, duct installation, ceiling closure, power availability, controls wiring, and access for inspection can depend on one another. A builder should confirm when HVAC work must be ready, what other work must be complete first, and how schedule changes will be communicated. These dependencies are site-specific; neither duration nor disruption should be assumed before the scope and construction conditions are understood.

Galaxy’s confirmed capability is commercial HVAC installation for new construction. Specific design, permitting, coordination, commissioning, documentation, or other deliverables should be discussed and confirmed in the project agreement rather than assumed to be included in that general capability.

Plan verification and a useful owner handover

Before occupancy, agree on how the completed system will be checked and who is responsible for each part of that process. Verification appropriate to the equipment and agreed scope may address operating modes, airflow, electrical operation, condensate drainage, safeties, sensors, and communication with thermostats or building controls. The project team should identify the applicable manufacturer requirements, test records, deficiencies, and sign-off responsibilities. Commissioning scope is not automatic; confirm what is included and how unresolved items will be tracked.

A practical handover helps the owner operate and maintain the system after contractors leave. Confirm what equipment schedules, operation instructions, control information, warranties, approved submittals, and service records will be provided, and by whom. Facility staff should know how to change ordinary occupied schedules, whom to contact about alarms or abnormal conditions, and which settings should not be altered without review. Keep the records accessible to future service providers.

Maintenance planning should reflect the installed equipment, building use, occupancy, and manufacturer guidance. Seasonal checks and filter or component service needs are easier to plan when the owner receives accurate model and control information. Galaxy offers commercial HVAC maintenance options; the appropriate frequency and scope should be discussed for the completed system and its operating conditions.

Project planning

Prepare the project for a defined HVAC scope

  1. 01

    Describe the building

    Provide the site, intended use, occupancy assumptions, and available architectural and mechanical information. Flag areas where the future tenant or layout is not yet known.

  2. 02

    Resolve the interfaces

    Have the project team align equipment locations, duct routes, power, supports, controls, and access. Identify any design or specialty review still needed.

  3. 03

    Confirm responsibilities

    Document included work, exclusions, approvals, and the parties responsible for permits, inspections, and other trades. Confirm Galaxy’s proposed role for your project.

  4. 04

    Define acceptance

    Agree on startup and performance checks, balancing or commissioning scope, and the records needed at handover. Track unresolved items before the building enters normal use.

For Bay Area facilities

Information to bring to the discussion

  • Project address and building use
  • Occupancy and operating schedules
  • Drawing revisions and design status
  • Shell versus tenant fit-out boundaries
  • Equipment and zoning preferences
  • Roof, structural, and power constraints
  • General contractor and design-team contacts
  • Target milestones and approval dependencies
Questions

New Construction FAQ

Does Galaxy provide HVAC installation for new commercial buildings?

Yes. New Construction HVAC is part of Galaxy’s commercial capability. Contact us with the location, intended use, and available drawings to discuss the installation scope and confirm project fit.

What information is needed for equipment sizing?

Useful inputs include building envelope and glazing, orientation, occupancy, operating hours, lighting and equipment heat, and ventilation or exhaust requirements. The project team should confirm these assumptions rather than select equipment from floor area alone.

Can HVAC be planned before the future tenant is known?

Planning can begin with documented shell-building assumptions, but an unknown tenant leaves important loads and ventilation needs unresolved. State what the initial system is intended to serve and revisit the design when the actual use, layout, and occupancy are established.

Who handles design, permits, and coordination with other trades?

These responsibilities must be assigned in the project scope. Confirm who provides design documents, determines permit requirements, arranges inspections, and coordinates structural, roofing, electrical, and controls work. Do not assume every task is included in an HVAC installation proposal.

What should be checked before a new system is handed over?

The agreed acceptance scope should address startup, operating modes, airflow and balancing, ventilation, controls, drainage, and relevant electrical or refrigerant checks. Confirm the documentation, training, and outstanding-item record the owner will receive; specific deliverables depend on the project agreement.

Where does Galaxy offer new-construction HVAC?

Galaxy serves Contra Costa and Alameda counties, plus San Francisco. Confirm the project location and proposed scope with us. CSLB #1076868 · B, C-10, C-20.

The next move

Talk to a commercial HVAC specialist.

Serving Contra Costa and Alameda counties, plus San Francisco. Explore locations.